Sunshine and Polythene

February 8, 2017

 

 

 

On Monday the conditions were just right - sunshine and not much wind - to put the polythene over the new polytunnel.  Firstly we had to put anti hot spot tape onto all the metal hoops where the polythene touches it. We also fixed the staging brackets (to make a work bench along one side). The polythene sheet was so large, it took 6 of us to hold onto it and slide it over the hoops into place. We then had to fix it using bendy blue wire, all the way round the base and door frames.  After lunch we divided up jobs, so two of us dug a drainage trench along side the polytunnel, and the others followed the instructions to make the doors.  

 

 

 

 

 

 

 

Share on Facebook
Share on Twitter
Please reload

Featured Posts

I'm busy working on my blog posts. Watch this space!

Please reload

Recent Posts

November 6, 2019

September 21, 2018

September 7, 2018

Please reload

Search By Tags

I'm busy working on my blog posts. Watch this space!

Please reload

Follow Us
  • Facebook Black Square
  • Twitter Black Square
  • Google+ Black Square